Manufacturing

The manufacturing application of Scipio ERP 4.0: bills of material, routings, work centres, production runs, MRP and standard costs, rebuilt for 4.0 with fourteen new screens, production lines, fabrication orders, lot reservation by weight, barcode capture, and a bicycle demo that ships with the release.

Make to stock, make to order and raw-material procurement on the same data as the shop, the warehouse and the books. Multi-level bills of material, routings on work centres with calendars and capacity, production runs from plan to close, MRP against forecasts and orders, and a standard cost by material, labour and overhead. In 4.0 the application was reviewed, rated and rebuilt.

The dashboard, in 4.0.

Runs, running tasks, MRP proposals and shortages on one screen. This is the real screen, in the Aurora theme, on the bicycle demo that ships with the release.

scipio · manufacturing · dashboard
The manufacturing dashboard of Scipio ERP 4.0

We rebuilt manufacturing for 4.0.

Planning, the floor, stock and cost, rebuilt screen by screen and service by service on a core that was already sound. Every record on this band ships in the bicycle demo.

  • 14new screens
  • 22new services
  • 4new entities
  • 12tools for your agent

Planning

MRP that knows the plant and the supplier.

  • Run MRP for one plant or for all of them
  • Purchase proposals start earlier by the supplier's lead time
  • Make or buy, with the preferred supplier on every proposal
  • One link hands the buy proposals to the order application

Bills of material

Multi-level, with rules, exploded on screen.

  • A structure panel opens the tree level by level
  • AND rules, scrap factors, formulas and sequence
  • A four-step setup guide on the BOM screen itself
  • Where-used for any component

The floor

Lines, machines, and a barcode per task.

  • A production line holds its machines; the operator picks one on the shop floor
  • A label sheet per run, one Code 128 barcode per task
  • Scan to start, complete or declare; every scan is kept
  • Declaration with a reject reason and backflush

Orders and runs

Fabrication orders group the runs.

  • One order, many runs, one status derived from them
  • A production run straight off a sales order
  • A dashboard of runs, tasks, proposals and shortages
  • Work centre load per machine and per line

Stock

Every component with its stock and a shortage mark.

  • Inputs with QOH and ATP; outputs and co-products
  • Lot reservation by weight: a 500 kg coil held for one task
  • Replace a component until it is issued
  • Produce into a location

Cost

Standard, actual and variance, per task.

  • Standard cost by material, labour and overhead
  • Run costs per cost type, per task and for the run
  • Machines with their load, workers assigned to the run
  • Cost rows in the demo, so the page is never empty

The new screens

  • Dashboard, shop floor, work centre load
  • MRP runs, run detail, proposals, event plan
  • Product cost, run costs, where-used, reports hub
  • Fabrication orders, find and edit
  • Scan a task, label sheet per run
  • Production run from an order, declaration with reject

Under it

  • Minilang is gone; ten XML scripts are Java now
  • Forty-two test methods in eight classes, and the framework faults they found are fixed
  • Calendars honour exception days and weeks
  • Every screen carries tooltips and a setup hint
  • Labels in English and German, in the Aurora theme

Proof it works

  • A three-level bicycle ships with 4.0
  • Five work centres and a welding cell with a robot and a manual bay
  • A 500 kg steel coil, suppliers with a seven-day lead time
  • A sales order, a forecast, a fabrication order and run history
  • Scheduled jobs enabled out of the box

Load the demo and every record above is already there.

Say it in plain words.
A production order comes out.

“We are 40 units short on MPL-9290 before the autumn campaign. Plan the run and get it on the line for next week.”

A work order on Tuesday's first shift, every component checked against stock, and the line told what to build. The routing was already in Scipio, so the agent read the times instead of inventing them.

inventory_getbom_getproduction_run_createproduction_run_update_status

Example data. Every call is a tool the manufacturing server ships.

ScipioERP ScipioShopWarehouse
Production order WO-2291
Product
MPL-9290 · Thumb MP3 Player
Quantity
40 units
Starts
Tue 9/8/26 06:00 · shift 1
Materials
Bill of materials · all lines in stock
StepTaskWork centreTime10AssembleLine 225 min20TestBench10 min30Pack—5 min

Total run time26 h 40 min

Released to line 2

See it run on your own data.

A walk through the application with the people who build it, on your catalogue and your processes. Or bring your agent and try the tools yourself.